Installation & Acceptance Checklist

Use this general checklist to structure delivery, installation, testing, documentation, and training. Add equipment-specific acceptance limits from the approved contract and manufacturer documents.

Completion 0 of 30
01

Before delivery

02

Receiving inspection

03

Installation and functional checks

04

Performance, documentation, and handover

Project-specific acceptance notes

Required test load / operating condition: ________________________________________________

Acceptance limits and instrument references: _____________________________________________

Deviations, actions, owner, and due date: _________________________________________________

Final acceptance signatures: _____________________________________________________________