Use this general checklist to structure delivery, installation, testing, documentation, and training. Add equipment-specific acceptance limits from the approved contract and manufacturer documents.
Completion0 of 30
Project: ____________________________________
Equipment / model: __________________________
Date / inspector: ___________________________
01
Before delivery
02
Receiving inspection
03
Installation and functional checks
04
Performance, documentation, and handover
Project-specific acceptance notes
Required test load / operating condition: ________________________________________________
Acceptance limits and instrument references: _____________________________________________
Deviations, actions, owner, and due date: _________________________________________________
Final acceptance signatures: _____________________________________________________________